Search results

    Filter results

  • Full text

  • Document type

  • Publication year

  • Organisation

Results: 218
Number of items: 218
  • Open Access
    Switzer, A., Janssen-Jansen, L., & Bertolini, L. (2013). Inter-actor trust in the planning process: the case of transit-oriented development. European Planning Studies, 21(8), 1153-1175. https://doi.org/10.1080/09654313.2012.722940
  • Open Access
    Tan, W. W. Y. G. Z. (2013). Pursuing transit-oriented development: Implementation through institutional change, learning and innovation. [Thesis, fully internal, Universiteit van Amsterdam].
  • Hull, A., Silva, C., & Bertolini, L. (2012). COST Action TU1002 - Accessibility instruments for planning practice. COST. http://www.accessibilityplanning.eu/wp-content/uploads/2012/10/COST-Report-1-FINAL.pdf
  • te Brömmelstroet, M., & Bertolini, L. (2012). Land use and transport information that matters. In H. Geerlings, Y. Shiftan, & D. Stead (Eds.), Transition towards sustainable mobility: the role of instruments, individuals and institutions (pp. 251-269). (Transport and mobility series). Ashgate.
  • Open Access
    Beukers, E., Bertolini, L., & te Brömmelstroet, M. (2012). Percepties op het MKBA proces. Tijdschrift Vervoerswetenschap, 48(2), 68-79. http://www.vervoerswetenschap.nl/attachments/article/216/TVW_2012_06_Beukers%20et%20al_48_2.pdf#page=1
  • Open Access
    Beukers, E., Bertolini, L., & te Brömmelstroet, M. (2012). Why Cost Benefit Analysis is perceived as a problematic tool for assessment of transport plans: a process perspective. Transportation Research Part A - Policy and Practice, 46(1), 68-78. https://doi.org/10.1016/j.tra.2011.09.004
  • Open Access
    Ferreira, A., Batey, P., te Brömmelstroet, M., & Bertolini, L. (2012). Beyond the dilemma of mobility: exploring new ways of matching intellectual and physical mobility. Environment and Planning A, 44(3), 688-704. https://doi.org/10.1068/a44258
  • Open Access
    Bertolini, L. (2012). Integrating mobility and urban development agendas: a manifesto. DISP, 48(1), 16-26. https://doi.org/10.1080/02513625.2012.702956
  • Open Access
    Bertolini, L. (2012). Conclusion: time to act. Planning Theory & Practice, 13(3), 489-490. https://doi.org/10.1080/14649357.2012.704712
  • Open Access
    Bertolini, L., Curtis, C., & Renne, J. (2012). Station area projects in Europe and beyond: towards transit oriented development? Built Environment, 38(1), 31-50. https://doi.org/10.2148/benv.38.1.31
Page 13 of 22