A Head-to-Head Comparative Study of Control Charts based on Estimated Parameters

Open Access
Authors
Publication date 2017
Journal Quality Engineering
Volume | Issue number 29 | 2
Pages (from-to) 244-253
Organisations
  • Faculty of Economics and Business (FEB)
  • Faculty of Economics and Business (FEB) - Amsterdam Business School Research Institute (ABS-RI)
Abstract
Implementation of the Shewhart, CUSUM, and EWMA charts requires estimates of the in-control process parameters. Many researchers have shown that estimation error strongly influences the performance of these charts. However, a given amount of estimation error may differ in effect across charts. Therefore, we perform a pairwise comparison of the effect of estimation error across these charts. We conclude that the Shewhart chart is more strongly affected by estimation error than the CUSUM and EWMA charts. Furthermore, we show that the general belief that the CUSUM and EWMA charts have similar performance no longer holds under estimated parameters.
Document type Article
Language English
Published at https://doi.org/10.1080/08982112.2016.1237651
Downloads
Permalink to this page
Back