A robust Xbar control chart

Open Access
Authors
Publication date 2013
Journal Quality and Reliability Engineering International
Volume | Issue number 29 | 7
Pages (from-to) 951-970
Organisations
  • Faculty of Economics and Business (FEB) - Amsterdam School of Economics Research Institute (ASE-RI)
Abstract
This article studies alternative standard deviation estimators that serve as a basis to determine the control chart limits used for real-time process monitoring (phase II). Several existing (robust) estimation methods are considered. In addition, we propose a new estimation method based on a phase I analysis, that is, the use of a control chart to identify disturbances in a data set retrospectively. The method constructs a phase I control chart derived from the trimmed mean of the sample interquartile ranges, which is used to identify out-of-control data. An efficient estimator, namely the mean of the sample standard deviations, is used to obtain the final standard deviation estimate from the remaining data. The estimation methods are evaluated in terms of their mean squared errors and their effects on the performance of the phase II control chart. It is shown that the newly proposed estimation method is efficient under normality and performs substantially better than standard methods when disturbances are present in phase I.
Document type Article
Language English
Related publication Response to the letter to the editor
Published at https://doi.org/10.1002/qre.1447
Downloads
qre1447.pdf (Final published version)
Permalink to this page
Back