Monitoring process variability using auxiliary information
| Authors | |
|---|---|
| Publication date | 2008 |
| Journal | Computational Statistics |
| Volume | Issue number | 23 | 2 |
| Pages (from-to) | 253-276 |
| Organisations |
|
| Abstract |
In this study a Shewhart type control chart namely V (r) chart is proposed for improved monitoring of process variability (targeting large shifts) of a quality characteristic of interest Y. The proposed control chart is based on regression type estimator of variance using a single auxiliary variable X. It is assumed that (Y, X) follow a bivariate normal distribution. The design structure of V (r) chart is developed and its comparison is made with the well-known Shewhart control chart namely S-2 chart used for the same purpose. Using power curves as a performance measure it is observed that V (r) chart outperforms the S-2 chart for detecting moderate to large shifts, which is main target of Shewhart type control charts, in process variability under certain conditions on rho(yx) . These efficiency conditions on rho(yx) are also obtained for V-r chart in this study.
|
| Document type | Article |
| Published at | https://doi.org/10.1007/s00180-007-0084-6 |
| Downloads | |
| Permalink to this page | |